இது தான் Fixation of TRCA of GDS தொடர்பான ஆர்டர்கள்
No.6-1/2009-P.E.II
Government of India
Ministry of Communications & IT
Department of Posts
(Establishment Division)
Dak Bhawan, Sansad Marg
New Delhi – 110001
Dated: 10 December, 2009
All Chief Postmasters General
Sub: Implementation of Recommendations of Shri R.S.Nataraja Murti
Committee – Revision of Wage Structure of Gramin Dak Sevaks (GDS)
This has the reference to this Directorate Order of even number
dated 09th October 2009 on the subject cited above.
2. It is clarified that the existing incumbents may be placed in the replacement TRCA slabs corresponding to the pre-revised TRCA. New TRCA slab corresponding to 87.5 Points, 112.5 Points and up to 125 Points in r/o GDS Branch Postmasters has to be assessed afresh with reference to the workload.
Sd/-
(Surender Kumar)
Assistant Director General (GDS / PCC)
Revision of wage structure of GDS
CHQ Letter No.
1-1/RR-GDS-1 dated 12.11.2009 to the DDG (Estt.), Department of Posts, New
Delhi.
Sub: - Revision of wage
structure of GDS
Ref:
- Your letter No. EST/GDS/RSNM/Commission/08 dated 16.10.09
In para 2 of Annexure V of
the above referred order, it is stated that the respective Authorities shall
fix the TRCA of all the GDS working under their jurisdiction with reference to
their existing work load, basic TRCA drawn as on 1-1-2006 and send the names of
GDS with statement of fixation o f TRCA as on 1-1-2006 as per given formula and
also intimate the annual increases up to the date of issue of orders to the
DDOs.
In this letter no orders were issued for fixation of the TRCA of
those GDS officials who’s TRCA was revised after 1.1.2006. Some
Divisional Heads interpreting the work “existing work load” as work load as on
date of revision i.e., after 1-1-2006 and fixing the new TRCA in the new slabs
as per the work load, whether it may be 3rd, 4th or 5th. Some divisional heads
are interpreting the same work, as work load as on 1-1-2006 and fixing the TRCA
as per the TRCA drawn as on 1-1-2006 and allowing three increments and no
refixation is being done on the date of revision in pre revised scale. If the
intention of the Department is to fix TRCA as per the TRCA drawn as on1-1-2006,
there is no need to add the words existing work load.
This ambiguity needs to be
removed and specific orders should be issued.
There must be specific orders, on how to fix the TRCA of those GDS officials whose TRCA was revised after 1-1-2006.
NEW RECRUITS -- In para 2.1 it was stated s, the TRCA to GDS engaged on or after 1-1-2006 shall be fixed at the minimum of the revised TRCA slab from the date of their engagements. In para 3 it was stated as “the fixation will be done at the minimum of the New TRCA slab applicable as on their date of engagement. What is meant by slab applicable? Whether it is as per the work load of that Post? If it is so, if the work load of a B.O is 125 points whether a new recruiter can be given minimum TRCA of the 5th Scale? Orders without any ambiguity may be got issued.
There must be specific orders, on how to fix the TRCA of those GDS officials whose TRCA was revised after 1-1-2006.
NEW RECRUITS -- In para 2.1 it was stated s, the TRCA to GDS engaged on or after 1-1-2006 shall be fixed at the minimum of the revised TRCA slab from the date of their engagements. In para 3 it was stated as “the fixation will be done at the minimum of the New TRCA slab applicable as on their date of engagement. What is meant by slab applicable? Whether it is as per the work load of that Post? If it is so, if the work load of a B.O is 125 points whether a new recruiter can be given minimum TRCA of the 5th Scale? Orders without any ambiguity may be got issued.
STAGNATION--- Some BPMs are already stagnating in 1st
TRCA. This is happening because some GDS SVs in pre revised 2nd scale were
redeployed as BPMs with pay protection. After new fixation they are now at
stagnation stage.
WORK
LOAD CALCULATION--- Till date the work
load of the GDS is being calculated on the existing norms only. Many GDS BPMs,
TRCA is revised from 1st to 2nd TRCA
after 1-1-2006 as the work load of NREGS is taking into calculation. As till
date no norms are revised, all the GDS officials TRCA should be fixed based on
the existing work load and there should not be any ceiling on pay slabs. Fixing
of ceiling 3rd scale to BPMs is quite injustice.
If at all the Department implements, the date of effect should be prospectively and not retrospective from 1-1-2006.
Reply received
from the Department vide letter No. 6 – 1/m2009- PE.II dated 04th Jan2010
I am directed to refer to
your letter No. 1-1/RR-GDS-1 dated 12.11.2009 on the above subject.
2. The issues raised have been examined.
2. The issues raised have been examined.
(i)
The term ‘existing workload’ referred to in the order dated 09-10-09 indicates
the workload of GDS as on the date of implementation of the orders i.e 01-01-06
but not the workload as on date of the re-fixation. The orders are very clear
that the revised TRCA for GDS working as on 31-12-05 will be in the replacement
slabs only. The slabs recommended for BPMs for 3.5 hours, 4.5 hours and 5 hours
will be for future increase/ revision as per the revised norms of the workload
in point system
(ii) In regard to BPMs
whose TRCA was Rs.1600-40-2400 will be replaced by Rs.3660-70-5760 as approved
by the Government.
(iii) In
regard to BPM, whose TRCA is revised to second TRCA after 01-01-06, their TRCA
has to be fixed in the replacement slab of Rs.3660-70-5760 from the date of
revision as per the fixation method, but not in ant other slab.
3. In
respect of GDS who were recruited after 01-01-06, their TRCA has to be fixed at
the minimum of the new slab indicated depending upon the workload on the date
of his appointment. For example, if the Branch Postmaster is having a workload
up to 75 points only, the new TRCA will be at the minimum of Rs.2745-50-4245.
The same principle has to be adopted for other categories of GDS in fixation.
4. The Branch Postmaster
stagnating at the maximum of the first TRCA, their allowance has to be fixed as
per the method approved in the replaced TRCA. If the fixation results in the
more than maximum of the replaced TRCA, it has to be restricted to maximum of the
new revised TRCA.
5. Your contention that
the allowances of GDS have to be fixed based on the existing workload as on the
date of re-fixation is not correct. The TRCA has to be re-fixed as on the
workload on 1-01-06 only. The TRCA proposed for BPMs for 3.5 hours, 4.5 hours
and 5 hours are for future revision of TRCA based on the revised norms. Orders
for revision of norms for cash handling at Rs.20000 for 1 point have already
been issued.
6. This issues with the approval of DDG (Establishment)
No comments:
Post a Comment